
County Road 42 Reconstruction and County Road 43 Diversion Phase 4
Project Overview
The project involved the widening and reconstruction of County Road 42 from a two-lane to a four-lane urban cross-section to improve traffic flow and safety for the growing community. The scope of work included the addition of sidewalks on both sides of the roadway to enhance pedestrian connectivity and accessibility, as well as the installation of new curbs and boulevard features. As part of the assignment, the company provided comprehensive construction inspection services, ensuring compliance with design specifications, municipal standards, and contract requirements. The work also included coordination and inspection of underground utilities, such as new storm and sanitary sewer connections, watermain adjustments, and service connections for multiple adjacent properties. The inspection team monitored construction activities related to road widening, utility installations, concrete works, asphalt paving, traffic management, and overall quality assurance. The project contributed to improved traffic capacity, safety, and infrastructure reliability along County Road 42 and its connecting corridors.
